Gib stopping and painting of Torbay Bathroom

Typical of our bathroom jobs this bathroom and toilet refit required some skimming and repair work to existing and new Gib board. The ceiling was square stopped for a more modern look. Both rooms and doors where re-painted with contrasting feature walls in each. To achieve a great finish walls and ceiling required thorough cleaning and preparation befor stopping and painting. Ceilings where painted with mould resistant paint. The client was very happy with her new bathrooms and commented staff where great to have in the home.

 

< Read other case studies

Testimonials

"their internal quality assurance is second to none."

Case Studies

Wheturangi Greelance Case StudyArjen and his team were contracted to supply fix stop and paint plasterboard in our new home. Additionally they where contracted for the exterior painting. We are extremely pleased with the attention to detail and the level achieved with the final product. PBFs commitment to satisfaction has been exceptional, as too often companies over promise and under deliver. I can say categorically say PBF (Arjen) have demonstrated a great commitment in achieving the highest standard. The extent of the guarantee from PBF is also distinguishing feature in the market place. This provides my family with great comfort. For the reasons of quality finish and commitment to satisfaction I have recommended PBF to family and friends. Chris Connor Greenlane

Why you should choose us for your next job

Paint and Plasterboard Finishing - Auckland Painters

Website by Generate Design